The following is the list of many projects that we have taken pride to do Structural Engineering design and Observation from inception to their completion. This List is being developed and will be expanded with photographs.

16201 Lindbergh St. Industrial, tilt-up, 30,500 s.f., hybrid joist/girder roof system. photo
Van Nuys, CA
 
1934 14th StreetFire rehabilitation, 9,213 s.f. of ground floor & 3,983 s.f. of mezzanine, CMU wall construction, panelized glu-lam system.photo
Santa Monica, CA
 
249 Gardena Blvd. TWA.Industrial, 40,066 s.f. warehouse & 2nd floor offices, tilt-up, panelized hybrid roof system.photo
Carson, CA
 
385 Grand Cypress FedEx & AdditionIndustrial, tilt-up, 41,175 s.f. (2004) & 12,980 s.f. (2008), hybrid joist/girder roof system, walls designed to be relocated for future expansion.photo
Palmdale, CA
 
8098 San Fernando RdFire rehabilitation, 9,738 s.f. ground floor, 2,100 s.f. of mezzanine, CMU wall construction, panelized glu-lam system.photo
Sun Valley, CA
 
9261 Jordan Ave.Addition of 2-nd floor within an existing tilt-up industrial builing with seismic separation.Total of 62,800 s.f. open wood trusses and steel SCBF all sides.photo
Chatsworth, CA
 
Arroyo StorageCommercial, tilt-up, 72,208 s.f. warehouse & 3000 s.f. of partial 2nd floor, total 75,208 s.f., hybrid joist/girder roof system with plywood roof diaphragm, recessed loading dock and lunch patio. photo
Los Angeles, CA
 
Cardservice International, Malibu Hills RoadTwo story commercial building, total 39,168 s.f., panelized glu-lam roof system & steel beams with open web wood trusses at 2nd floor.photo
Calabasas, CA
 
Chandler StudiosStudio building, 14,988 s.f. warehouse, 40 feet high tilt-up panels, with 100 ft span tapered girders & panelized roof system.photo
Van Nuys, CA
 
Cozycroft Dock AdditionNew addition of truck loading area by deepening existing tilt-up walls to create dock-high condition.photo
Chatsworth, CA
 
Crosspoint Properties 7500 N. Tyron St.,Industrial/Multi-tenant building, tilt-up, 33,588 s.f., hybrid joist/girder roof system.photo
Van Nuys, CA
 
Deckers Outdoor Corp. 250 Coromar Drive Commercial, one story building, tilt-up construction, total 29,970 s.f., hybrid joist/girder roof system with plywood sheathing. Also, 265 ft long concrete retaining walls, max. 16 feet high to support permanent cuts, Building 3, UNDER CONSTRUCTION. photo
Goleta, CA
 
Deckers Outdoor Corp. 6649 Hollister Ave,Commercial, two story building, tilt-up construction, total 75,135 s.f., hybrid joist/girder system with metal roof & hybrid floor decks with lightweight concrete, Building 1, UNDER CONSTRUCTION photo
Goleta, CA
 
Deering CourtIndustrial, tilt-up, total 28,000 s.f. including mezzanine, panelized glu-lam system.photo
Canoga Park, CA
 
Delta ScientificIndustrial, tilt-up, 120,150 s.f. warehouse, 7,700 s.f. mezzanine, hybrid joist/girder system plus 3620 s.f. of covered storage area. photo
Palmdale, CA
 
Flower Street Business Park 7 buildings, total 95,000 s.f. tilt-up Panelized glu-lam roofphoto
Burbank, CA
 
Flynn Road Business Park Phase 1 Five Industrial & one two story office buildings, total 110,816 s.f., tilt-up, hybrid joist/girder roof system.photo
Camarillo, CA
 
Flynn Road Business Park Phase 2Six Industrial & one two story office buildings, total 83,036 s.f., tilt-up, hybrid joist/girder roof system.photo
Camarillo, CA
 
Gibbs & AssociatesTwo-story tilt-up, total 22,464 s.f., panelized glu-lam system.photo
Moorpark, CA
 
Gold Coast Recycling CenterRecycling & Material Transfer Station 44,500 s.f., tilt-up, hybrid roof system.photo
Ventura, CA
 
Hillside Business Center Bldgs A & BTwo industrial buildings, 35 ft high tilt-up panels, 44,736 s.f. & 43,008 s.f., panelized glu-lam system.photo
Simi Valley,CA
 
Hillside Business Center Lot 5Industrial, tilt-up, 71,532 s.f. ground floor & 13,824 s.f. of mezzanine, panelized glu-lam roof system.photo
Simi Valley, CA
 
Hillside Business Center Lot 7Industrial, tilt-up, total 24,682 s.f., panelized glu-lam roof system. photo
Simi Valley, CA
 
Howard Properties 2880 Ontario St.Industrial, tilt-up, 59,104 s.f. of warehouse & 6,089 s.f. 2nd floor, total 59,193 s.f., hybrid joist/girder roof system with plywood roof diaphragm. photo
Burbank, CA
 
Howard Properties 3000 San Fernando Blvd.Industrial, tilt-up, 22,935 s.f. of warehouse & 4,673 s.f. 2nd floor, total 27,612 s.f., hybrid joist/girder roof system with plywood roof diaphragm. (Under Construction)photo
Burbank, CA
 
IPA Graves InvestorsIndustrial, tilt-up, 43,316 s.f. warehouse & 3,129 mezzanine, hybrid joist/girder roof system.photo
Oxnard, CA
 
Jake WoodIndustrial, tilt-up, 74,680 s.f. warehouse & 21,320 s.f., mezzanine, total 96,000 s.f., hybrid joist/girder roof system.photo
Conejo Blvd., Newbury Park, CA
 
KG Cochran7 industrial buildings, from 6183 s.f. to 20,495 s.f., total 64765 s.f., hybrid joist/girder roof system.photo
Cochran St., Simi Valley, CA
 
Lanark StreetIndustrial, tilt-up, 43,172 s.f. warehouse with truck ramp canaopy, panelized glu-lam roof system.photo
Sun Valley, CA
 
Lars Russel ProjectIndustrial, tilt-up, 19,320 s.f. of warehouse & 998 s.f. of mezzanine, hybrid joist/girder roof system. photo
Palmdale, CA
 
Leeds EngineeringIndustrial, 88,584 s.f. tilt-up, with 2nd floor offices, panelized glu-lam system.photo
Oxnard, CA
 
Malabar InternatinalManufacturing, tilt-up, 24,000 s.f. of warehouse & 6,335 s.f of future mezzanine, panelized glu-lam system. photo
Simi Valley, CA
 
Medical Building HealthwestCommercial, 3-story tilt-up, total 55,296 s.f., panelized glu-lam roof system, open joist wood truss & steel floor framing. photo
Van Nuys, CA
 
Microwave Monolithics, Inc.Industrial, tiltl-up, 20,638 s.f. warehouse & 8,165 s.f. of mezzanine, panelized glu-lam roof sytem. photo
Simi Valley, CA
 
North Ranch Corp. CenterThree- story office building, total 38,106 s.f, steel construction with metal composite deck system. photo
Thousand Oaks, CA
 
Oso Ave/P & R InvestmentIndustrial, tilt-up, total 15,440 s.f. , panelized glu-lam system.photo
Chatsworth, CA
 
Pacific Center Industrial3 industrial buildings, tilt-up, lot 5A total 51,840 s.f., lot 5B total 27,400 s.f., all including mezzanine & lot 12 total 27,000 s.f., hybrid joist/girder roof system.photo
Oceanside, CA
 
PTI TechnologiesManufacturing, tilt-up, 118,300 s.f., with mezzanine, panelized hybrid roof system.photo
Oxnard, CA
 
Rancho Dominguez Business CenterFour industrial buildings, tilt-up, total 91,281 s.f. including mezzanine, hybrid joist/girder roof system.photo
Rancho Dominguez, CA
 
RIF 2 -Bledsoe StreetIndustrial, tilt-up, total 114,800 s.f. w/ mezzanine, hybrid joist/girder roof system.photo
Sylmar, CA
 
RIF-1, Camino Del SolIndustrial, tilt-up, 66,975 s.f warehouse & 2,725 s.f. mezzanine, hybrid joist/girder roof system.photo
Oxnard, CA
 
Roscoe/Reseda Medical BuildingCommercial, 3-story steel structure, moment resisting steel space frame, total 27,939 s.f., composite metal deck at roof and floors. photo
Northridge, CA
 
Roxford Business Center3 Industrial buildings, total 83,613 s.f., tilt-up, w/2-nd floor offices, hybrid joist/girder roof system.photo
Encinita Ave. , Sylmar, CA
 
Roxford Development 3 Industrial buildings, total 167,829 s.f., tilt-up, w/mezzanine, panelized glu-lam roof system, over existing storm channels.photo
Sylmar, CA
 
SOS MetalsIndustrial, tilt-up, 53,184 s.f., including open loading dock. Office buildiing, one story, tilt-up, 4,992 s.f., all panelized glu-lam roof system.photo
Carson, CA
 
Sport Fitness CenterSport & fitness center, tilt-up, hybrid metal deck roof system, total of 96,038 s.f.photo
Thousand Oaks, CA
 
Teller RoadIndustrial, tilt-up, 14,138 s.f. warehouse & 7,164 s.f. mezzanine, panelized roof system.photo
Newbury Park, CA
 
Tourney Professional PartnersTwo-story tilt-up building, total 33,082, composite metal deck of roof and floor construction. photo
Santa Clarita, CA